1. Brief and site visit
The bureau starts with how the owner lives, or how guests will use the space, the budget range and the deadline. The team measures the property and visits the site. For a project abroad, the team flies in at the start for measurements and to meet the local partners.
A useful habit at this point: agree a budget per square metre before anything is drawn. It decides the level of materials and brands, and it prevents a full redesign after the first cost estimate.
2. Layouts and concept
Floor plans come first, then mood boards. We also generate AI images for quick approval of the direction, because a client who does not read plans can react to a picture in minutes and change it during the same meeting. The client approves the layout and the style direction.
3. 3D visualisation
Once the concept is agreed, we build the 3D model and renders of every room. This is the stage where most changes are cheap, because nothing has been ordered or built. It takes real attention from the client: this is where decisions are made.
4. Working documentation
Drawings, specifications and details that a builder can price and execute. Hidden services such as pipes, structure and electrical stay with local engineers, and we coordinate the exchange: our sketches, their engineering documents, our final drawings. Stages can overlap. Documentation for a floor can start as soon as the visuals for that floor are approved.
5. Estimate and procurement
A cost estimate by room and by item, with links, prices and alternatives. Furniture, lighting and materials are chosen and ordered, usually with trade pricing from suppliers. The procurement manager joins from the mood-board stage, so that what is drawn can actually be bought and delivered on time.
6. Construction and supervision
The designer visits the site to check that the work follows the drawings. With a local project manager on site, supervision can be partly remote: the team stays on call, and visits become more frequent toward handover. See what project management involves.
7. Styling and handover
Furniture installation, decoration, books and accessories, then photography of the finished space. This is the stage clients often underestimate. It is what makes a finished apartment look like a home.
What the client approves at each stage
| Stage | Client approves | What it fixes |
|---|---|---|
| Brief | Brief, budget per square metre | Level of materials and scope |
| Layouts and concept | Floor plan, style direction | Walls, zones, mood |
| 3D visualisation | Rooms, materials, key pieces | What the home will look like |
| Working documentation | Drawings and specification | What the builder prices and builds |
| Estimate and procurement | Costed specification, orders | The furnishing budget |
| Construction | Changes, samples on site | The finished build |
| Styling | Final placement | The home as handed over |
How long it takes
A full design project with drawings and procurement typically takes 5 to 9 months from brief to completed documentation. A visualisation-only job, one room plus mood boards, is a matter of weeks. The factors are set out in how long an interior design project takes.
How the stages differ for developers
For a residential development the order is similar, but the brief comes from the buyer profile and the sales plan rather than from one family. Visualisation often comes earlier, because CGI is needed for marketing before the building is finished, and the specification has to work for many units at once. Show homes and lobbies follow their own programme, tied to the launch date.
Approval before the next stage
Each stage is delivered and approved before the next one begins. It keeps both sides honest: later work builds only on decisions the client has seen and signed off.
Who is involved at each stage
A premium interior is never drawn by one person. The make-up of the team changes as the project moves from ideas to a finished house, and knowing who joins when helps the client plan their own time.

During the brief and the concept, the conversation is mostly between the client, the lead designer and the project manager. A measured survey is carried out, and where the building is listed or the structure will change, a structural engineer and, where the law requires one, a licensed architect are brought in early, because their constraints shape the layout.
During visualisation and working documentation the circle widens. Mechanical and electrical engineers size heating, cooling and ventilation; a lighting designer may be added on larger houses; joinery makers and stone suppliers are consulted on details before drawings are issued, so that what is drawn can actually be made.
During procurement and construction the contractor becomes the largest team on the project. The bureau's role shifts to supervision: checking work against drawings, answering site questions, approving samples and keeping the procurement tracker current. Specialist installers for kitchens, audio-visual systems and window treatments arrive in a planned order.

At styling and handover the team narrows again: the designer, the stylist and the project manager, with a final walk-through alongside the client and a snag list that is closed before the keys are handed over.
Frequently asked questions
How many stages does an interior design project have?
Seven in our practice: brief, layouts and concept, 3D visualisation, working documentation, estimate and procurement, construction and supervision, styling and handover. Some stages overlap floor by floor.
Which stage is the most important?
The layout. Every later decision, from joinery to lighting and furniture, depends on the plan, and a change to the plan after the drawings are issued is the most expensive kind of change.
Can a project start with visualisation only?
Yes. A visualisation of one room or zone with mood boards is a common first step, and it can grow into a full project later.
Does the designer manage the builders?
On a turnkey project the bureau coordinates the contractor and supervises the works against the drawings. The contractor holds its own contract with the client.
Read next: How we run a project
Can a stage be skipped to save time?
Rarely without cost. Skipping 3D visualisation often leads to changes on site, and skipping full working documentation leaves the contractor to make design decisions. Stages can be shortened on a simple refresh, but on a full renovation each one prevents a more expensive problem in the next.
Does the client need to attend every meeting?
No. The client is needed at the brief, at each approval point and at handover. Between those moments the bureau works with engineers, makers and the contractor and reports in writing, so that meetings with the client are kept for decisions rather than updates.