What project management covers
Budget control. A budget plan, updated weekly, shows what has been spent, what is committed and what is still open. When a decision changes the number, the owner hears about it before it happens.
Coordination of everyone on site. Contractors, joiners, electricians, engineers and suppliers all work from the same drawings. The project manager answers their questions, issues clarifications and makes sure that a change in one trade is passed to the others.
Procurement tracking. Furniture, stone, lighting and fittings have lead times. The project manager tracks orders against the building schedule, so that the sofa does not arrive before the floor is finished, and the stone does not arrive three months late.
Quality checks. Supervision visits compare what is built with what was drawn: finishes, joints, levels, details. Problems found on a visit cost much less than problems found at handover.
Reporting. A short weekly report: planned against actual, with photographs. The owner can follow the project from another city or another country without reading a single drawing.
Project manager and design supervision: the difference
The project manager runs the process: budget, schedule, people, orders. Design supervision, often called author supervision, is the designer's check that the result matches the design. In a well-run project both exist, and they work together. On a larger project the designer and the procurement specialist can attend the same site visit, and the project manager keeps the follow-up.
| Role | Answers for | Typical output |
|---|---|---|
| Project manager | Budget, schedule, coordination, orders | Budget plan, weekly report, change log |
| Design supervision | Match between design and result | Visit notes, clarifications, sample approvals |
| Contractor | The construction itself, under its own contract | Programme, works, warranties |
Who pays the suppliers
Where the bureau runs project management with procurement, it places the orders and pays the suppliers from the approved budget, and reports every payment. Where the client or another party runs project management, that party pays the suppliers and the bureau recommends what to order. The contractor holds a separate contract with the client in both cases. Agreeing this at the start avoids the most common disputes about who is responsible for a late or wrong delivery.
Remote projects
Owners do not have to be on site for most of the build. A local project manager handles daily matters; the design team stays on call and visits at agreed points. The frequency usually rises toward handover, to two or three visits a month, when details and finishes matter most. Hidden services such as plumbing and structure stay with local engineers, and the design team coordinates with them through a clear exchange of drawings.
Changes on site
Every project has changes: a wall that hides a pipe, a supplier that discontinues a fabric, a new idea once the room has walls. A good process records each change, prices it, gets it approved and passes it to every trade it affects. Changes approved verbally on site, without a price, are the main reason budgets drift.
Handover and snagging
Before the keys are handed over, the team walks the home room by room and lists what is unfinished or wrong. The contractor and suppliers correct the list, and the team checks again. Manuals, warranties and maintenance notes for stone, timber and systems are collected in one place for the owner.
How to judge whether a firm manages projects properly
- Who is the named project manager, and how many projects do they run at once?
- Is there a weekly budget plan, and can the client see it?
- What does a weekly report contain?
- How often are site visits, and who attends?
- Who has the authority to approve a change on site, and how is it priced?
- What happens if the designer or the manager has to be replaced?
Reports, meetings and the paper trail
Good project management is visible in its paperwork. On a premium renovation the client should never have to ask what happened on site last week: the answer should already be in a report.

The core document is the site visit report. After each visit the project manager records progress room by room with photographs, the questions raised by the contractor and the answers given, any work that does not match the drawings, and the decisions still waiting for the client. Each open point carries a name and a date, and the list is carried forward until every item is closed.
Alongside the reports runs a short weekly or fortnightly meeting with the contractor. It covers the programme, the next deliveries from the procurement tracker, access and storage on site, and any change requests. Minutes are circulated the same day, so that agreements made in conversation do not get lost.
Changes are handled in writing. A request, whether it comes from the client or from site conditions, is described, priced by the contractor and approved before work proceeds. This protects the budget and avoids the most common dispute at the end of a project: work that was asked for informally and never costed.

For owners who live abroad, the same record lets them follow the house from anywhere. Video walk-throughs at key moments, such as before plastering and before the kitchen goes in, complement the written reports and allow decisions to be made without travelling.
Frequently asked questions
Is project management included in interior design?
Not always. Many designers provide design only. On a turnkey project the bureau includes project management with procurement, so one team answers for the result.
Does the owner need to be on site?
No. Weekly reports with photographs and planned visits let owners follow the project from abroad. Key decisions on samples can be made at the office or by video.
How often does the team visit the site?
At agreed points during the works, and more often toward handover, typically two or three visits a month when finishes are installed.
Who is responsible for the construction?
The contractor, under its own contract with the client. The bureau coordinates, supervises the works against the drawings and reports.
Read next: How we run a project
How often does a project manager visit the site?
It depends on the stage and the size of the house. Visits are most frequent during first fix, before plastering and during installation of kitchens and joinery, when mistakes are cheapest to correct. The schedule of visits is agreed at the start and written into the proposal.
Who keeps the warranties and manuals at the end?
They are collected during installation and handed over as one handover pack: warranties, manuals, maintenance notes for finishes and contact details for every maker and installer, together with the final drawings of the home.