How a turnkey interior project works: stages, timing and decisions

A turnkey project takes a home from an empty shell to a finished, furnished interior under one team. Design and implementation are separate stages, and before design starts the client sees a first budget and schedule.

Text: Aiya Lisova, Founder
12 October 2026 · 7 min

1. Brief and preparation

We visit the property, measure and photograph it and go through the brief: who uses which rooms, how often the home is used and what should be kept. The client receives a first estimate for the whole project, so its scale is clear before design begins.

The client decides: the scope and the budget the design is held to.

The most expensive changes are the ones made on site. Everything we can decide on screen, we decide on screen.

2. Design project

Design runs in three steps. A concept with layouts and collages; 3D visualisation of every room; then working drawings coordinated with the engineers, with a full specification of finishes, furniture and lighting. Layouts and 3D include two rounds of revisions.

The client decides: the layout, the look of each room and the finishes.

Concept board and material palette
Concept board and material palette

3. Budgeting

From the approved design our procurement team prices every finish, fitting, light and piece of furniture, using the bureau’s trade terms with suppliers. The estimate is split by room and comes with a purchase and payment plan.

The client decides: the budget and the implementation schedule.

4. Project management and procurement

We order everything from request to installation, check samples with the client and track every delivery. Our architects visit the site, check the works against the drawings and send a written report with photos after every visit. At the end the home is styled and photographed.

The client decides: only what genuinely needs a client decision.

Furniture and lighting installed
Furniture and lighting installed

In short

  • Design and implementation are separate stages.
  • Before design starts, the client sees a first budget and schedule.
  • The budget is reviewed twice, before and after the design is settled.
  • One manager runs the project and reports after every site visit.

Read next in services: Process · Fees · Villas

Share
↑

Other stories

Topics

AIYA Bureau interiorAIYA Bureau interiorAIYA Bureau interiorAIYA Bureau interiorAIYA Bureau interiorAIYA Bureau interior

Every project is a dialogue between architecture, space and the way a client lives. Our projects carry the same approach: a considered layout, restrained aesthetics and attention to detail.

Portfolio

Letters from the bureau

New articles from the journal on budgets, materials and how projects run, twice a month. No advertising.

Discuss a project

Tell us where the property is, its size and the preferred start date. We reply within one working day and arrange a call to show comparable projects.