Stage by stage
Design runs in four steps: brief and measured survey; concept, with zoning and a material palette; 3D visualisation of the key rooms; working drawings and specification. Each ends with a result the client approves before the next begins.
Procurement runs in parallel with the works, and long-lead pieces are ordered early, so the home is furnished soon after the site is finished.
What makes a project longer
Permits and listed buildings, structural changes, a large amount of bespoke joinery and stone, and decisions that are reopened after the drawings are finished. Each of these can add weeks or months.

What makes it shorter
Decisions prepared so they take minutes: we bring two or three costed options, not twenty. Long-lead items ordered while the site is still in progress. And a first concept early, so the direction is agreed before detailed work starts.
The most reliable way to save time is to settle the brief and the budget at the start.
For developers
For developers, the schedule follows the sales and construction programme: we confirm it once we have seen the plans.
In short
- The schedule is set for each project after the first visit.
- Each stage ends with a result the client approves.
- Permits, bespoke work and reopened decisions add time.
- Prepared decisions and early orders save it.